Switch to Shopware 6 after a Migration Analysis

We provide the measurements for your decision for or against Shopware 6: what your current system is missing, what its maintenance costs, and which data comes along.

Product page Finn Hemd Leinen in the Kante design draft: a linen shirt on a hanger, next to it price, colors, and sizes; contains AI-generated images of the demo
Verona, Kante design draft in Figma

Verona, Shopware 6
Demo with sample data, not a client project.

Findings

We check these symptoms on your current shop, each with measurement method and source:

Feature gaps of the current system.

Measurement method: Comparison of your requirements with the feature set of the system; Source: Your requirements list and the vendor documentation.

Maintenance effort and update status.

Measurement method: Version status of the system and extensions compared with the current vendor version, only with a measurement and a date; Source: Vendor information.

Scope and quality of the data to be carried over.

Measurement method: Count and spot check of products, categories, customers, and orders; Source: Your shop itself.

Measurements in the trial move

ImportRecordsFailedDeviations
WooCommerce → Shopware 6.74170222

Records in 5 runs, failed records, deviations in the field comparison across 2825 comparisons. Example legacy shop (WooCommerce 11.2.1, fictitious) and test instance with Shopware 6.7, October 17, 2026, Shopware Import/Export. Demo with sample data, not a client project.

Free Quick Check

  1. Request. You submit the request and name your current shop system.
  2. Check. We check your shop.
  3. Findings. You receive your findings as a PDF with a recommendation.

Migration Analysis

Migration Analysis

Sample

Findings and recommended measures

CheckedOctober 17, 2026, product data of the legacy shop
StoreWooCommerce 11.2.1 → Shopware 6.7
MeasurementImport/Export, 5 runs, field comparison

Findings

WeightingFindingEvidenceEntry point
HighIf one image is missing, the whole product record failserror case in the trial moveMeasures 1 and 2, Quick Fix
MediumCustomer accounts cannot be moved with their passwordspassword method of WordPressMeasure 3, follow-up project
MediumThe old product and category URLs are missing from the exportredirect list neededMeasure 6, follow-up project

Excerpt from the findings and recommended measures in the sample report. Example legacy shop and test instance, checked on October 17, 2026. Demo with sample data, not a client project.

PDF in German, 6 pages, as of October 17, 2026

Evidence and demo

We show the data migration using an example: the existing data of a WooCommerce shop is carried over into a disposable Shopware 6 instance; the Fashion Demo Store shows the target state of the same range. This is a demo with sample data, not a client project.

Verona, Shopware 6

Demo with sample data, not a client project.

Shopware 6 relaunch and migration

Based on the analysis, we build your shop on Shopware 6 and carry over your data, with standard features before custom builds and tests before go-live. Concept, implementation, and quality assurance come from a single source. The Shopware 6 shop development page describes the shop development packages. Before we quote, there is a paid requirements workshop (half a day), which we credit toward the project; if you have already commissioned the Migration Analysis, it replaces the workshop. Quote on request.

Managed Service

After go-live, we continue to look after the shop in the Managed Service: hosting and security for a fixed monthly price, and everything else, such as updates of Shopware and plugins, as a service billed by effort. The Managed Service page describes the services. Quote on request.

Method

  1. Document the current state: Capture features, data, extensions, and interfaces.
  2. Compare: Place requirements and Shopware 6 side by side.
  3. Decide: Assess effort, risks, and benefit before anything is built.
  4. Move and check: Carry over data and check the result against the existing data.

Frequently asked questions

When does a switch pay off?

When the current system no longer supports your requirements or its maintenance costs more than it is worth. The findings show whether that is the case for you.

Which data can be carried over?

Products, categories, customers, and orders are the usual candidates. We record what can be carried over in your case in the Migration Analysis.

Which systems can I switch from?

We show the move using the existing data of a WooCommerce shop. The Quick Check asks which system you run today, and we tell you openly what we can derive from that.

How long does a switch take?

That depends on the findings and is stated in the plan of the Migration Analysis. We do not make blanket promises.

What does the switch cost?

We do not list prices on the website. You will receive a quote after the conversation.

Further reading

Let’s talk about your project

A call takes 30 minutes via Microsoft Teams: choose a free time, and the invitation arrives by email.

Choose a time

Free Quick Check for findings first